Pressure drawdown and sand production

$\quad \quad$
500 psi slow drawdown $\sim 60^\circ$ breakouts
$\quad \quad$
1000 psi rapid drawdown $> 90^\circ$ breakouts

© Cambridge University Press Zoback, Reservoir Geomechanics (Fig. 10.22, pp. 335)

Preventing sand production by limiting production rate

$\quad \quad$

© Cambridge University Press Zoback, Reservoir Geomechanics (Fig. 10.23, pp. 336)

Preventing sand production with perforation orientation

$\quad \quad$

© Cambridge University Press Zoback, Reservoir Geomechanics (Fig. 10.24a, pp. 337)

$\quad \quad$

© Cambridge University Press Zoback, Reservoir Geomechanics (Fig. 10.25, pp. 338)

Preventing sand production with azimuth changes

Considering fixed horizontal perforations

$\quad \quad$

© Cambridge University Press Zoback, Reservoir Geomechanics (Fig. 10.24b, pp. 337)